Author: APerkins

Day 11 Raised Bed Alternative

Okay, so I’ve decided to try a different tack with the raised bed, more “compartmentalized”.  Makes it a lot easier to create a “Square Foot Gardening ” bed, as well as creating “special” mixes or experiments with different soils.  What

Day 10

Ahhhh.  A sigh of relief.  Ran the hoses to the garden area and filled the wicking bed, then left it sit overnight.  Still full of water the next day when I walked the dog, so I don’t have to dig

Wicking Bed – Overview

A wicking bed relies on the soils ability to wick water up to one foot in height.  When properly constructed, it acts much like a  saucer under a potted plant.  The soil will draw up only as much moisture as

Tagged with:

Day 9

Just a quick post, continued covering the hugelkulture bed, now has 11 wheelbarrows full of soil covering it, just 6 more to go!  Also covered it with some grass clippings and thatch.  It’s looking awfully dry.  Tomorrow I’ll need to

Day 8 – Lasagna’s Assembled!

That was easy! Well, actually a lot of it was done last year. Since it has had about six months to cook, it’s actually ready to go, so it’s really “maintenance layers” from this point forward. A lasagna garden is

Day 6 & 7… The Lasagna Bed

I was driving back from the transfer station with empty garbage cans and recycling bins, I passed by our favorite horse farm. It’s not our favorite because of the people (who are friendly), or the type of horses, (which are

Day 5 – The Day of Rest?

Okay, so my calendar was off.  It was a beautiful day, and tomorrow may rain, but I did get many other things accomplished, including getting some seeds locally.  As a final post for now regarding preparing a hugelkultur bed, I

30 Minutes – Day 4 Progress

Overcast, and when I went out it rained, but not enough to soak.  Backed off on trying to cover the logs completely with the rotting stump-peat (?), and focusing on moving dirt.  Four more wheel-barrows of dirt (only 17 to

30 Minutes – Day 3 – RAIN

RAIN.  “You can’t solve rain.” – So says Merlin Mann in his latest “Back to Work” segment.  Incredible to listen to him resolve issues – he’s able to verbalize thought processes like nobody I know.  But enough about that –

30 Minutes, Day 2

Okay – I may have to bend the rules this weekend, weather permitting.  The second day has brought industriousness and insight:  1/4 done, this bed is going to take approximately 21 more wheelbarrow loads of soil, 12 wheelbarrows full of

Top